Basin Project

PROJECT OVERVIEW

  • The Basin Property is in close proximity to Highway 905 and lies in the northeastern part of the Athabasca Basin.

  • The Project is ~ 4,347 hectares in size.

  • Refined Energy has an option agreement to own up to 100% interest in the Basin Project.

  • Historical exploration has identified radioactive anomalies associated with linear and conductive features.

  • Structural features which have been identified include faults, dykes, sills and lithological contacts

Click to enlarge

Milner Lake Project

PROJECT OVERVIEW

  • The Milner Property is located approximately 5 kilometres west of Missinipe and Highway 102, and 60 kilometres north of La Ronge, Saskatchewan in the Athabasca Basin.

  • The Project is ~ 1,067 hectares in size.

  • Channel sampling of this area revealed uranium mineralization, mainly uranophane and autunite, which occurs at the contact of granitic gneiss and pegmatite.

  • The seventeen channel samples taken from a 15.2 m trench yielded assays ranging from 0.003% to 0.500% U3O8, averaging 0.072% U3O8.

  • Grab samples taken by a prior operator of the Milner Property from the biotitic and feldspathic phases returned 0.70% and 0.127% U3O8.

Click to enlarge